Project We Are Proud Of
Slope Protection Works for Hay Al Turath - Ghubrat Nizwa Road

Comprehensive Slope Stabilization for a Strategic Mountain Corridor
Project Overview
Project Details
- Project: Slope Protection Works for Hay Al Turath - Ghubrat Nizwa Road
- Client: Sultanate of Oman - Ministry of Transport & Communications
- Scope: Slope protection and consolidation works
- Quantities Executed:
- 20,060 m² Reinforced Wire Mesh
- 1,440 m² Cable Netting
- 4,200 m² Rockfall Barrier
- 30,067 m² Shotcrete
- 2,076 lin.m Rock Dowels
- 9,254 m² Concrete Lining
- 910 m³ Gabions
- 242,625 m³ Excavation, Light Cleaning & Scaling

Challenges Identified
- Steep, High-Risk Cut SlopesMultiple sections required stabilization across varied heights and rock qualities.
- Active Rockfall and Unstable BlocksFractured zones and loose blocks posed direct hazards to passing traffic.
- Large Workfront with Varying ConditionsEach slope segment required a tailored stabilization method due to non-uniform geology.
- Access and Safety ConstraintsWork at height, drilling operations, and robotic shotcrete application demanded strict safety coordination.
- Need for Long-Term DurabilityThe road required protection systems capable of withstanding weather cycles, runoff, and continuous exposure.
Solution Implemented:
1. Reinforced Mesh & Cable Netting
- •Installed 20,060 m² of reinforced wire mesh to secure weathered rock surfaces.
- •Applied 1,440 m² of cable netting in areas with larger fractured blocks requiring higher containment strength.
2. High-Energy Rockfall Barrier
- •Installed 4,200 m² of rockfall barriers rated up to 2,000 kJ to intercept falling rocks before reaching the roadway.
3. Shotcrete Surface Protection
- •Applied 30,067 m² of shotcrete using robotic spraying for consistency, durability, and safe execution on steep faces.
4. Structural Anchoring & Dowels
- •Drilled and installed 2,076 lin.m of rock dowels to consolidate unstable rock masses and improve overall slope stability.
5. Concrete Lining & Gabion Structures
- •Constructed 9,254 m² of concrete lining for berm protection, drainage paths, and surface durability.
- •Installed 910 m³ of gabions for toe support and erosion control.
6. Excavation, Cleaning & Scaling
- •Performed 242,625 m³ of excavation, cleaning, and scaling to remove loose rock and prepare slope surfaces for safe installation.
Project Outcomes: Slope Protection Works for Hay Al Turath - Ghubrat Nizwa Road
Significant Improvement in Road Safety
The combination of mesh systems, dowels, shotcrete, and rockfall barriers drastically reduced rockfall risks along the corridor, improving safety for commuters and long-distance transport.
Stable Slopes Across a Large Mountain Section
With over 20,000 m² of mesh and more than 30,000 m² of shotcrete installed, the slopes now demonstrate improved structural consistency and resistance to weather-driven deterioration.
Enhanced Protection Against Major Rockfall Events
The 2,000 kJ barrier system provides a reliable defense against high-energy rockfall, safeguarding vehicles and infrastructure along high-exposure segments.
Durable, Long-Term Surface Protection
Concrete lining, robotic shotcrete, and cable netting created a multilayered barrier against erosion, allowing the slopes to withstand long-term environmental stresses.
Support to a Critical Transport Link
The project reinforced a vital mountain route, supporting mobility, trade, and community connectivity in the region.

Sustainability Development Goals (SDGs) Alignment






Related Services

Consulting Engineering

Vegetative Erosion Control Solutions

Non-Vegetative Erosion Control

Geohazard Mitigation

Slope Stabilization

Foundations & Ground Engineering
Related Projects
Would you like to work with us?
Join our team of certified professionals and be part of cutting-edge engineering projects.
CareersDo you have a requirement?
Get expert consultation and customized solutions for your engineering project needs.
Get a Quote