Treatment, Protection & Rock Stabilization Works for the Dubai-Fujairah Freeway

Treatment, Protection & Rock Stabilization Works for the Dubai-Fujairah Freeway

Securing Steep Mountain Slopes Along a Strategic National Highway

The Dubai-Fujairah Freeway traverses rugged mountain terrain where steep rock cuttings and fractured slopes pose ongoing rockfall and stability risks. To ensure the long-term safety of this critical transport corridor, comprehensive slope protection and consolidation works were required across multiple high-risk sections.
TEICO delivered an integrated rock stabilization solution combining surface containment, rockfall interception, and structural consolidation—executed under challenging access and elevation conditions.

Project Overview

The project involved treatment and stabilization of steep rock slopes directly adjacent to the freeway. These slopes exhibited weathered surfaces, loosened rock blocks, and potential for high-energy rockfall events.
The scope included both surface stabilization and rockfall protection to safeguard road users and infrastructure.

Project Details

  • Project: Treatment, Protection & Rock Stabilization for Dubai-Fujairah Freeway
  • Client: United Arab Emirates - Ministry of Public Work
  • Scope: Slope Protection and Consolidation Works
  • Quantities Executed:
    • 4,000 m² Reinforced Wire Mesh
    • 12,000 m² Rockfall Barrier
Treatment, Protection & Rock Stabilization Works for the Dubai-Fujairah Freeway

Challenges Identified

  • Steep, High-Elevation Rock FacesMany slope sections were located at extreme heights with limited ground access, requiring specialized work-at-height methods.
  • Loose and Weathered Rock MassFractured rock and unstable boulders created a continuous risk of rockfall onto the freeway.
  • Potential for High-Energy Rockfall EventsThe slope geometry and elevation demanded protection systems capable of intercepting falling rocks before reaching traffic lanes.
  • Restricted Access for Equipment and InstallationConventional drilling and installation equipment could not be deployed in several sections, necessitating alternative access solutions.

Solution Implemented:

1. Scaling and Boulder Removal
  • Performed controlled scaling and removal of loose boulders using specialized climbers operating at high elevation.
2. Reinforced Wire Mesh Installation
  • Installed 4,000 m² of reinforced wire mesh to provide surface confinement and prevent raveling of loosened rock fragments.
3. Rockfall Barrier System
  • Installed 12,000 m² of rockfall barrier to intercept falling rocks and protect the freeway from high-energy impacts.
4. Specialized Drilling Operations
  • Executed drilling using saddle systems and rigs mounted on baskets to safely access steep and irregular rock faces.

Project Outcomes: Treatment, Protection & Rock Stabilization Works for the Dubai-Fujairah Freeway

Enhanced Safety Along a Major Transport Corridor

The combined mesh and rockfall barrier system significantly reduced the risk of rockfall incidents, ensuring safer travel along the Dubai-Fujairah Freeway.

Stabilized Slopes Across Challenging Terrain

Surface confinement and consolidation measures improved overall slope behavior, minimizing progressive erosion and block detachment.

Effective Protection Against High-Energy Rockfall

The installed rockfall barriers provide a reliable interception system capable of protecting road users from major rockfall events.

Successful Execution Under Extreme Access Conditions

Specialized access techniques and controlled installation methods enabled safe and precise execution on steep, high-elevation slopes.

Durable, Long-Term Slope Performance

The engineered stabilization systems deliver long-term resilience against weathering, erosion, and ongoing geological activity.

Project outcome

Sustainability Development Goals (SDGs) Alignment

SDG 6
SDG 9
SDG 11
SDG 12
SDG 13
SDG 15

Related Services

Consulting Engineering

Consulting Engineering

Vegetative Erosion Control Solutions

Vegetative Erosion Control Solutions

Non-Vegetative Erosion Control

Non-Vegetative Erosion Control

Geohazard Mitigation

Geohazard Mitigation

Slope Stabilization

Slope Stabilization

Foundations & Ground Engineering

Foundations & Ground Engineering

Related Projects

Slope Protection at Al Khad-Sham Road, Sohar

Location: Al Khad-Sham Road, Sohar, Oman

Slope Stabilization and Erosion Control at Government of Oman

Location: Qurm, Oman

Slope Stabilization and Erosion Control at Musandam Gas Plant

Location: Musandam, Oman

Slope Stabilization and Erosion Control at DUQM Gas Supply Station

Location: Duqm, Oman

Slope Erosion Control System at His Majesty Villa

Location: Boushar, Oman

Erosion Control System at Oman Shooting Range-Azaiba

Location: Muscat, Oman

Would you like to work with us?

Join our team of certified professionals and be part of cutting-edge engineering projects.

Careers

Do you have a requirement?

Get expert consultation and customized solutions for your engineering project needs.

Get a Quote