See how TEICO can solve your biggest challenges.

Project we are proud of

Slope Protection Works for the Wadi Adai – Al Amerat Road (Phase 2)

Road & Highway

Slope Protection Works for the Wadi Adai – Al Amerat Road (Phase 2)

Project details

Location: Wadi Adai – Al Amerat Corridor, Muscat, Sultanate of Oman
Client: Muscat Municipality – Sultanate of Oman
Scope: Slope Protection
Quantities Delivered:

  • 80,000 m² Mesh

  • 320 m² Rockfall Barrier – 1,000 kJ

  • 750 m² Rockfall Barrier – 3,000 kJ

  • 210 m² Rockfall Barrier – 5,000 kJ

Delivering Advanced Slope Protection Along One of Muscat’s Steepest Mountain Corridors

Phase 2 of the Wadi Adai – Al Amerat Road development involved deep rock cutting through rugged, high-gradient terrain. These newly formed slopes presented varying levels of instability—from surface raveling to potential high-energy rockfall events—requiring a multi-system protection strategy.

TEICO deployed a combination of mesh containment and energy-rated rockfall barriers to secure the mountain face and ensure safe passage for motorists along this critical transport link.

This phase of the road expansion introduced fresh cut slopes with highly variable rock quality. To ensure stability across the corridor, surface protection and high-energy interception systems were installed according to detailed geotechnical mapping and risk zoning.


Project Details

  • Project: Wadi Adai – Al Amerat Road (Phase 2)

  • Location: Wadi Adai – Al Amerat Corridor, Muscat, Sultanate of Oman

  • Client: Muscat Municipality – Sultanate of Oman

  • Scope: Slope Protection

  • Quantities Delivered:

    • 80,000 m² Mesh

    • 320 m² Rockfall Barrier – 1,000 kJ

    • 750 m² Rockfall Barrier – 3,000 kJ

    • 210 m² Rockfall Barrier – 5,000 kJ

Challenges

  • Fresh Rock Cuts with Significant Surface Instability
 Weathered layers and loose blocks required immediate containment to prevent raveling onto the road.

  • High-Energy Rockfall Exposure
 Steep slope geometry created the potential for rock blocks to accelerate and reach high-impact energies.

  • Variable Geology Along the Alignment
 Changing rock mass conditions demanded adaptive solutions suited to each risk zone.

  • Long Slope Sections Adjacent to Active Traffic
 Safety and precision were essential during installation to avoid disruption to road users.

  • Need for Long-Term Durability
    The road required protection systems capable of withstanding weather cycles, runoff, and continuous exposure.

Solutions

$25

Project Outcomes: Slope Protection Works for the Wadi Adai – Al Amerat Road (Phase 2)

  • Comprehensive Protection Across All Risk Levels The combined mesh and multi-energy barriers addressed everything from surface raveling to extreme rockfall scenarios.
  • Improved Safety Along a Critical Mountain Route Motorists now benefit from predictable slope behavior and robust rockfall interception along the corridor.
  • Engineered Stability Tailored to Variable Terrain Each slope section received the protection system best suited to its geotechnical conditions and rockfall dynamics.
  • Long-Term Performance with Optimized Maintenance Durable materials and certified barrier systems ensure stability with minimal intervention, supporting the road’s long-term sustainability.

All projects · Contact us