Project we are proud of

Slope Protection Works for Hay Al Turath - Ghubrat Nizwa Road

Road & Highway

Slope Protection Works for Hay Al Turath - Ghubrat Nizwa Road

Project details

Location: Hay Al Turath – Ghubrat Nizwa Road
Client: Sultanate of Oman – Ministry of Transport & Communications
Scope: Slope protection and consolidation works
Quantities Executed:
20,060 m² Reinforced Wire Mesh
1,440 m² Cable Netting
4,200 m² Rockfall Barrier
30,067 m² Shotcrete
2,076 lin.m Rock Dowels
9,254 m² Concrete Lining
910 m³ Gabions
242,625 m³ Excavation, Light Cleaning & Scaling

Comprehensive Slope Stabilization for a Strategic Mountain Corridor

The Hay Al Turath - Ghubrat Nizwa Road required extensive slope protection and stabilization works to ensure the safe passage of vehicles through steep, geologically variable terrain.

TEICO delivered a complete slope protection package, integrating reinforced mesh, cable netting, rockfall barriers, shotcrete, and structural anchoring to secure the corridor against long-term surface degradation and rockfall hazards.

Executed from August 2014 to August 2015, the project strengthened one of the region's important transport links by combining engineering accuracy, efficient work sequencing, and durable protection systems.

$25

Challenges

  • Steep, High-Risk Cut Slopes
    Multiple sections required stabilization across varied heights and rock qualities.

  • Active Rockfall and Unstable Blocks
    Fractured zones and loose blocks posed direct hazards to passing traffic.

  • Large Workfront with Varying Conditions
    Each slope segment required a tailored stabilization method due to non-uniform geology.

  • Access and Safety Constraints
    Work at height, drilling operations, and robotic shotcrete application demanded strict safety coordination.

  • Need for Long-Term Durability
    The road required protection systems capable of withstanding weather cycles, runoff, and continuous exposure.

Solutions

$26

Project Outcomes: Slope Protection Works for Hay Al Turath - Ghubrat Nizwa Road

  • Significant Improvement in Road Safety The combination of mesh systems, dowels, shotcrete, and rockfall barriers drastically reduced rockfall risks along the corridor, improving safety for commuters and long-distance transport.
  • Stable Slopes Across a Large Mountain Section With over 20,000 m² of mesh and more than 30,000 m² of shotcrete installed, the slopes now demonstrate improved structural consistency and resistance to weather-driven deterioration.
  • Enhanced Protection Against Major Rockfall Events The 2,000 kJ barrier system provides a reliable defense against high-energy rockfall, safeguarding vehicles and infrastructure along high-exposure segments.
  • Durable, Long-Term Surface Protection Concrete lining, robotic shotcrete, and cable netting created a multilayered barrier against erosion, allowing the slopes to withstand long-term environmental stresses.
  • Support to a Critical Transport Link The project reinforced a vital mountain route, supporting mobility, trade, and community connectivity in the region.