Slope Protection Works for the Upgradation of Birkat Al Mouz – Sayq Road

Road & Highway

Slope Protection Works for the Upgradation of Birkat Al Mouz – Sayq Road

Project details

Location: Birkat Al Mouz – Sayq Road, Sultanate of Oman
Client: Sultanate of Oman – Ministry of Transport & Communications
Scope: Slope Protection


Quantity Executed:

  • 61,000 sqm of Reinforced Mesh

  • 2,600 m of Rock Dowels

  • 2,500 m of Rock Anchors

Stabilizing High-Elevation Slopes Along a Critical Mountain Route

The upgradation of the Birkat Al Mouz – Sayq Road required specialized slope protection works across steep, high-altitude terrain. The route passes through rugged mountain sections where cut slopes are exposed to weathering, rockfall risk, and long-term instability.

TEICO was engaged to deliver slope protection solutions using advanced access methods and controlled installation techniques to ensure safety, durability, and uninterrupted road functionality.

The project focused on protecting steep cut slopes along the Birkat Al Mouz – Sayq corridor, where conventional access methods were not feasible. Slope protection works were executed using basket-supported drilling, saddle systems, and specialized climbers to safely stabilize exposed rock faces.
Project Details

  • Project: Upgradation of Birkat Al Mouz – Sayq Road

  • Location: Birkat Al Mouz – Sayq Road, Sultanate of Oman

  • Client: Sultanate of Oman – Ministry of Transport & Communications

  • Scope: Slope Protection


  • Quantity Executed:

    • 61,000 sqm of Reinforced Mesh

    • 2,600 m of Rock Dowels

    • 2,500 m of Rock Anchors

Challenges

  • Extensive Weathered and Fractured Rock Faces
    Large sections of the slope consisted of highly weathered rock with open joints and loosened surface blocks, increasing the likelihood of progressive raveling and rockfall.

  • Deep-Seated Instability Zones
    Certain slope sections showed signs of deeper instability, requiring reinforcement beyond surface protection to ensure long-term performance.

  • High and Continuous Cut Slopes
    The road alignment created long, uninterrupted rock faces where instability could propagate across wide areas if left untreated.

  • Exposure to Harsh Environmental Conditions
    Temperature variation, wind exposure, and rainfall events accelerated surface degradation and erosion along the slope faces.

Solutions

$25

Project Outcomes: Slope Protection Works for the Upgradation of Birkat Al Mouz - Sayq Road

  • Stabilized Large-Scale Slope Sections The system delivered uniform stability across long, high cut slopes with varying rock conditions.
  • Controlled Rockfall and Surface Degradation Loose material is effectively retained, minimizing risks to road users.
  • Long-Term Performance with Minimal Intervention Structural reinforcement and surface confinement reduce future maintenance needs.
  • Improved Safety Along a Strategic Mountain Route The upgraded road now benefits from predictable, engineered slope behavior.
  • Efficient Delivery Under Difficult Geotechnical Conditions Despite steep geometry and fractured rock mass, the project was completed with high safety standards and precise installation quality.