Slope Protection Works for the Dualisation of Bausher - Al Amerat Road (Phase 1)

Road & Highway

Slope Protection Works for the Dualisation of Bausher - Al Amerat Road (Phase 1)

Project details

Location: Bausher – Al Amerat Road, Muscat
Client: Sultanate of Oman – Muscat Municipality
Scope: Slope Protection
Quantities Executed:

  • 27,400 m² of Mesh

Stabilizing Steep Mountain Slopes for One of Muscat’s Most Critical Road Links

The Phase 1 dualisation of the Bausher–Al Amerat Road required slope protection across extremely steep and inaccessible rock faces. With no safe ground access for conventional equipment, TEICO executed a specialized installation program using helicopter transport, manual drilling, and controlled mesh placement.

The result is a secure mountain corridor that supports one of Muscat’s most important urban connections, improving long-term safety and slope performance.

The project involved stabilizing steep cut slopes along the Bausher–Al Amerat route, where fractured rock formations and high-gradient faces required a targeted slope protection system.
 TEICO installed 27,400 m² of wire mesh, reinforced through rock dowels and validated by pull-out testing to ensure performance under long-term load conditions.

Project Details

  • Project: Dualisation of Bausher – Al Amerat Road (Phase 1)

  • Client: Sultanate of Oman – Muscat Municipality

  • Scope: Slope Protection

  • Quantities Delivered:

    • 27,400 m² of Mesh

Challenges

  • Extremely Steep, Inaccessible Slopes
    Certain faces could not be reached by conventional equipment, requiring aerial material delivery.

  • Highly Fractured Rock Mass
    Loose and jointed rock zones increased the risk of rockfall during and after construction.

  • Manual, Rope-Access Drilling Requirements
    Drilling operations had to be executed entirely at height, demanding specialized safety procedures.

  • Verification of Anchor Performance
    Pull-out testing was essential to confirm load capacity before mesh installation.

Solutions

1. Aerial Delivery of Mesh Rolls

  • Transported mesh bundles to high-elevation faces using helicopter lifts to ensure safe and efficient material placement.

2. Manual Drilling on Steep Rock Faces

  • Performed anchor drilling using rope-access techniques across inaccessible slope sections.

3. Installation of High-Strength Wire Mesh

  • Installed 27,400 m² of wire mesh to contain loose blocks and improve surface stability.

4. Pull-Out Testing for Anchor Verification

  • Conducted systematic pull-out tests to confirm anchor capacity and ensure compliance with design requirements.

Project Outcomes: Slope Protection Works for Bausher - Al Amerat Road (Phase 1)

  • Reliable Slope Stability Across High-Risk Terrain The combination of deep anchoring and full-face mesh coverage significantly improved the structural stability of steep cut faces along the corridor.
  • Safe Execution on Slopes with No Ground Access Helicopter delivery and rope-access drilling ensured safe and controlled installation in areas impossible to reach with ground equipment.
  • Verified Anchor Performance for Long-Term Reliability Pull-out testing confirmed proper load transfer, supporting a durable and predictable slope protection system.
  • Reduced Rockfall Risk for Commuters The stabilized slopes provide a safer passage for motorists along one of Muscat's busiest and most challenging mountain routes.
  • Efficient Delivery Under Difficult Geotechnical Conditions Despite steep geometry and fractured rock mass, the project was completed with high safety standards and precise installation quality.